Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6260 Fire at Slurry Supplier May Affect Wafer Production at REC ASA - Ink World Magazine
Flexible Electronics News

Fire at Slurry Supplier May Affect Wafer Production at REC ASA

SiC Processing AS is currently unable to estimate the expected length of the production shutdown

SiC Processing AS had a fire in one of its two slurry plants at the Herøya industrial complex on Feb. 1, and will take down the plant and a similar plant in Glomfjord to seek for the root cause of the fire.

The company supplies slurry for wafer sawing to REC Wafer and the plant in question supplies REC Wafer’s two newest production plants, Herøya III and IV. A prolonged shutdown may affect REC Wafer’s production capabilities at some of REC’s wafer lines.

SiC Processing is currently unable to estimate the expected length of the production shutdown. REC will revert with more information as soon as possible, and will investigate possible alternative sources in case of a prolonged interruption of the slurry supply.

Add us as a preferred source on Google

Get the latest Ink World magazine news, insights and analysis in your Google Search and AI experiences.

Keep Up With Our Content. Subscribe To Ink World magazine Newsletters